Idlib-Ariha Road Maintenance
Idlib-Ariha Road Maintenance
Illustrative image
Idlib

Rehabilitation of the Idlib–Ariha road, widened to 25.5 metres by the General Establishment for Road Communications, reached about 50% completion in October 2026.

Announcement :
12.10.2026
Updated on :
14.11.2026
Governorate:
Idlib
Sector :
Yalbugha Commercial Complex, Damascus
Yalbugha Commercial Complex, Damascus
Damascus

The Damascus Awqaf Directorate began fit-out works in November 2026 on the Yalbugha Commercial Complex near Marjeh Square in Damascus, now under implementation.

Announcement :
12.11.2026
Updated on :
12.11.2026
Governorate:
Damascus
Sector :
Economic Housing
Economic Housing
Illustrative image
Hama

An urban development of 3,716 apartments on 550,000 m2 in Hama near Al-Arbaeen district, with shops, schools, health services and community facilities.

Area:
550000.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Qurtuba
Qurtuba
Illustrative image
Hama

An integrated residential project in Hama near Al-Ittihad roundabout with 1,000 units on 115,000 m2, with education, health, sports and retail facilities.

Area:
115000.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Hama Mall
Hama Mall
Illustrative image
Hama

A mixed-use project at the northern entrance of Hama combining a three-storey mall, a hotel in the concept and three residential towers with about 180 units.

Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Al-Mamouriya Park
Al-Mamouriya Park
Illustrative image
Hama

A concept to reconnect the centre of Hama with the Orontes, starting from Al-Mamouriya Square, along about 4.5 km of riverfront in old Hama.

Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Hama Park
Hama Park
Illustrative image
Hama

A proposed 149,295 m2 entertainment destination in Hama combining gardens, amusement rides, sports fields, restaurants, an events hall and a zoo.

Area:
149295.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Al-Andalus Park
Al-Andalus Park
Illustrative image
Hama

A concept for a 32,000 m2 public park in Hama beside Al-Ittihad Al-Ummali Street, combining green space, family entertainment and commercial services.

Area:
32000.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
View 180
View 180
Illustrative image
Hama

180 View – Living and Investment Destination in Hama, Syria

Area:
30000.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Engineers Tower
Engineers Tower
Illustrative image
Hama

Engineers Tower – Commercial, Business and Hospitality Project in Hama

Area:
3861.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :

Access requires sign-in

Please sign in to your account to view .
Al Mahatta Towers
|
Hama
Al Mahatta Towers
Illustrative image
No items found.

Al Mahatta Towers – Residential, Commercial and Service Development in Hama

Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Jasmine District
|
Hama
Jasmine District
Illustrative image
No items found.

Al Yasmeen District – Residential Development Project in Hama, Syria

Developer :
White Room Group
Area:
300000.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Mada
|
Hama
Mada
Illustrative image
No items found.

Mada – Investment and Living Development Project in Hama

Area:
6635.0
m²
Announcement :
11.11.2026
Updated on :
12.11.2026
Governorate:
Hama
Sector :
Latakia Port Development in Syria
|
Latakia
Latakia Port Development in Syria
Illustrative image
No items found.

Latakia Port Development in Syria: AD Ports Group's $667 Million 2026 Infrastructure Expansion Programme

Developer :
ad ports group
Area:
2800000.0
m²
Announcement :
02.04.2026
Updated on :
10.11.2026
Governorate:
Latakia
Sector :
Al-Furqlus Oil Refinery Project
|
Homs
Al-Furqlus Oil Refinery Project
Illustrative image
No items found.

Al-Furqlus Oil Refinery Project in Homs, Syria: A 210,000 Barrels per Day Refinery Development

Area:
8000000.0
m²
Announcement :
15.09.2026
Updated on :
10.11.2026
Governorate:
Homs
Sector :
Ebla Submarine Cable Between Syria and Cyprus
|
Tartus
Ebla Submarine Cable Between Syria and Cyprus
Illustrative image
No items found.

The Ebla cable links Tartus to Cyprus over 240 km with 31 Tbps at launch, according to the dean of Informatics Engineering at Idlib University.

Announcement :
15.09.2026
Updated on :
09.11.2026
Governorate:
Tartus
Sector :
Arab Mall and Mövenpick Hotel Complex
|
Damascus
Arab Mall and Mövenpick Hotel Complex
Illustrative image
No items found.

A mixed-use tourism and commercial project in Kafr Sousa, Damascus: a five-star hotel formerly known as the Mövenpick and Mall Al-Arab, under a 45-year investment contract on Damascus Governorate land.

Developer :
Sankari Holding
Announcement :
07.01.2026
Updated on :
07.11.2026
Governorate:
Damascus
Sector :
Al-Bukamal Main Water Station Rehabilitation
|
Deir ez-Zor
Al-Bukamal Main Water Station Rehabilitation
Illustrative image
No items found.

Rehabilitation of Al-Bukamal's main drinking water station, serving about 150,000 people, by Deir ez-Zor's water company with MSF and WeWorld, over a scheduled 40 days.

Rehabilitation of Al-Rashdiya Hospital in Deir ez-Zor
|
Deir ez-Zor
Rehabilitation of Al-Rashdiya Hospital in Deir ez-Zor
Illustrative image
No items found.

Rehabilitation of Al-Rashdiya Hospital (formerly the National Hospital) in Deir ez-Zor city, carried out by the Health Directorate with KOICA and UNDP.

Palmyra Oasis Rehabilitation
|
Homs
Palmyra Oasis Rehabilitation
Illustrative image
No items found.

Rehabilitation of the Palmyra Oasis irrigation channels and wells across 400 hectares; phase one serves about 200 hectares, restoring 3 km of channels and two wells.

Area:
4000000.0
m²
Announcement :
04.11.2026
Updated on :
04.11.2026
Governorate:
Homs
Sector :
Aleppo Thermal Power Plant Rehabilitation
|
Aleppo
Aleppo Thermal Power Plant Rehabilitation
No items found.

Rehabilitation of Units 2, 3 and 4 at the Aleppo Thermal Power Plant, which has five generating units with a combined capacity of about 1,100 MW; only one unit currently runs.

Developer :
Energy care group
Area:
500000.0
m²
Announcement :
04.11.2026
Updated on :
04.11.2026
Governorate:
Aleppo
Sector :
Nassib-Damascus Highway Maintenance and Rehabilitation
|
Daraa
Nassib-Damascus Highway Maintenance and Rehabilitation
Illustrative image
No items found.

The General Establishment for Road Transport and Kuwait's Joint Group Contracting Company signed a contract to maintain and rehabilitate the Nassib-Damascus highway.

Announcement :
22.09.2026
Updated on :
04.11.2026
Governorate:
Daraa
Sector :
Continuing Medical and Health Education Centre in Hama
|
Hama
Continuing Medical and Health Education Centre in Hama
Illustrative image
No items found.

Rehabilitation and equipping of Hama's Continuing Medical and Health Education Centre, a USD 2.7 million project funded by KSrelief and implemented by the Charitable Works and Social Care Association.

Announcement :
03.11.2026
Updated on :
03.11.2026
Governorate:
Hama
Sector :
Aleppo Exhibition City
|
Aleppo
Aleppo Exhibition City
No items found.

Aleppo's governor announced the start of work on the governorate's first and largest exhibition city, south of Aleppo, with ministries and specialised bodies cooperating.

Developer :
Aleppo Governorate
Area:
680000.0
m²
Announcement :
02.11.2026
Updated on :
02.11.2026
Governorate:
Aleppo
Sector :
Tal Rifaat Mill and Silos
|
Aleppo
Tal Rifaat Mill and Silos
Illustrative image
No items found.

The Tal Rifaat mill and silos in northern rural Aleppo have resumed operation after rehabilitation and a stoppage of about 14 years, with 12,000 tonnes of wheat storage capacity.

Announcement :
01.11.2026
Updated on :
01.11.2026
Governorate:
Aleppo
Sector :
Kafranbel–Orum al-Jawz Road Rehabilitation
|
Idlib
Kafranbel–Orum al-Jawz Road Rehabilitation
No items found.

Rehabilitation of the 23 km Kafranbel–Orum al-Jawz road in rural Idlib, linking Jabal al-Zawiya villages with Ariha, with new asphalt and road markings, carried out by SEBCO.

Announcement :
01.11.2026
Updated on :
01.11.2026
Governorate:
Idlib
Sector :
Al-Furn Suburb Residential Towers in Adra
|
Rural Damascus
Al-Furn Suburb Residential Towers in Adra
No items found.

The Syrian Establishment for Construction (SEBCO) continues building 8 residential towers in Adra's Al-Furn suburb; towers 1 and 5 have their concrete structures complete up to the ninth floor.

Announcement :
01.11.2026
Updated on :
01.11.2026
Governorate:
Rural Damascus
Sector :
Al-Jawhara Tower
|
Damascus
Al-Jawhara Tower
No items found.

Construction continues on Al-Jawhara Tower in Al-Bahsa, Damascus, a 32-floor Saudi-Syrian project with a declared investment of SAR 375 million.

Developer :
ethraa holding
Area:
25000.0
m²
Announcement :
23.07.2025
Updated on :
01.11.2026
Governorate:
Damascus
Sector :
Damascus International Airport Development and Expansion
|
Damascus
Damascus International Airport Development and Expansion
No items found.

Damascus International Airport development and expansion, an aviation concession led by UCC Holding, is under construction with Terminal 2 works under way.

Developer :
UCC Holding
Announcement :
06.08.2025
Updated on :
30.10.2026
Governorate:
Damascus
Sector :
Northern Al-Rouj Plain Irrigation Project
|
Idlib
Northern Al-Rouj Plain Irrigation Project
Illustrative image
No items found.

Rehabilitation of the Northern Al-Rouj plain irrigation project in rural Idlib, with irrigation pipes and fittings supplied in cooperation with FAO, to serve about 3,000 hectares of farmland.

Announcement :
29.10.2026
Updated on :
29.10.2026
Governorate:
Idlib
Sector :
New Grain Silos in Saraqib, Tal al-Toqan and Khan Shaykhun
|
Idlib
New Grain Silos in Saraqib, Tal al-Toqan and Khan Shaykhun
Illustrative image
No items found.

Three sites in Saraqib, Tal al-Toqan and Khan Shaykhun in Idlib governorate are being prepared for new grain silos with a combined capacity of about 36,640 tonnes, supervised by the Idlib Grain Branch.

Announcement :
28.10.2026
Updated on :
28.10.2026
Governorate:
Idlib
Sector :
Al-Maslakh Water Pumping Station Rehabilitation, Raqqa
|
Raqqa
Al-Maslakh Water Pumping Station Rehabilitation, Raqqa
Illustrative image
No items found.

Rehabilitation of the Al-Maslakh water pumping station in Raqqa, including new pumping units, to strengthen water supply for about 100,000 people.

Announcement :
27.10.2026
Updated on :
27.10.2026
Governorate:
Raqqa
Sector :
Rehabilitation of Qarif Water Station
|
Latakia
Rehabilitation of Qarif Water Station
Illustrative image
No items found.

The Latakia drinking water company completed rehabilitation of the Qarif water station in rural Jableh with three new pumps, ahead of supplying water to about 50,000 people.

Announcement :
27.10.2026
Updated on :
27.10.2026
Governorate:
Latakia
Sector :
Arida Border Crossing Rehabilitation
|
Tartus
Arida Border Crossing Rehabilitation
Illustrative image
No items found.

Rehabilitation of the Arida border crossing with Lebanon in Tartus, including a 72-metre bridge and the expansion and paving of the crossing yards, carried out by SEBCO.

Announcement :
27.10.2026
Updated on :
27.10.2026
Governorate:
Tartus
Sector :
Royal Village Complex, Bludan
|
Rural Damascus
Royal Village Complex, Bludan
No items found.

A residential and tourism complex in Bludan, Rif Dimashq, with nine buildings and 240 apartments of 85 to 240 sqm, plus amenities and a stated 70% finishing level.

Announcement :
26.10.2026
Updated on :
26.10.2026
Governorate:
Rural Damascus
Sector :
Al-Tanf–Al-Busayri Road
|
Al-Tanf–Al-Busayri Road
Illustrative image
No items found.

Syria's Ministry of Transport signed a $147 million contract to rehabilitate the Tanf–Basiri road and build a second 215 km carriageway, the ministry announced.

Announcement :
26.10.2026
Updated on :
26.10.2026
Sector :
Zamzam Kafr Hamra Third Project
|
Aleppo
Zamzam Kafr Hamra Third Project
No items found.

Two residential blocks with 20 apartments of 100–195 m² in Kafr Hamra, Aleppo.

Updated on :
26.10.2026
Governorate:
Aleppo
Sector :
Zamzam Kafr Hamra Second Project
|
Aleppo
Zamzam Kafr Hamra Second Project
No items found.

Three residential blocks with 60 apartments of 145–193 m² in Kafr Hamra, Aleppo.

Updated on :
26.10.2026
Governorate:
Aleppo
Sector :
Zamzam Kafr Hamra First Project
|
Aleppo
Zamzam Kafr Hamra First Project
No items found.

A residential block of 18 apartments of 169–182 m² over six levels in Kafr Hamra, Aleppo.

Updated on :
26.10.2026
Governorate:
Aleppo
Sector :
Zamzam Residential and Resort Suburb Project
|
Aleppo
Zamzam Residential and Resort Suburb Project
Illustrative image
No items found.

The Zamzam residential and vacation development is one of the largest planned gated communities in the Aleppo countryside, divided into four phases.

Area:
140000.0
m²
Announcement :
10.03.2026
Updated on :
26.10.2026
Governorate:
Aleppo
Sector :
Abyat Hills
|
Rural Damascus
Abyat Hills
No items found.

A Syrian-Saudi residential development in the Qudsaya suburb of Rif Dimashq, delivered through a partnership between the General Housing Establishment and Abyat. The published contract terms set 2,072 units across three phases, with delivery scheduled for 2028, 2029 and 2030.

Developer :
Abyat Real Estate
Area:
380000.0
m²
Announcement :
06.06.2026
Updated on :
24.10.2026
Governorate:
Rural Damascus
Sector :
Rehabilitation of Hama Fuel Storage Tanks
|
Hama
Rehabilitation of Hama Fuel Storage Tanks
No items found.

Rehabilitation of fuel storage tanks at the Hama Fuel Branch's operations and maintenance unit, with about 40 million litres of capacity, to raise reserve stocks and support supply stability.

Developer :
Hama Governorate
Announcement :
23.10.2026
Updated on :
23.10.2026
Governorate:
Hama
Sector :
Rehabilitation of Aisha Hospital in Al-Bukamal
|
Deir ez-Zor
Rehabilitation of Aisha Hospital in Al-Bukamal
No items found.

Deir ez-Zor Health Directorate is rehabilitating Aisha Hospital in Al-Bukamal with AMI and the Syria Recovery Trust Fund, ahead of opening operating rooms, intensive care units and a sterilization unit.

Announcement :
22.10.2026
Updated on :
22.10.2026
Governorate:
Deir ez-Zor
Sector :
Dar wa Amar Tourist and Residential Complex in Al-Qalamoun
|
Rural Damascus
Dar wa Amar Tourist and Residential Complex in Al-Qalamoun
Illustrative image
No items found.

A tourist and residential complex by Dar wa Amar in Qalamoun, Rural Damascus, on 53,000 sqm, with a hotel, restaurants, pools, about 300 tourist apartments and villas.

Developer :
Dar wa Amar
Area:
53000.0
m²
Announcement :
22.10.2026
Updated on :
22.10.2026
Governorate:
Rural Damascus
Sector :
Rehabilitation of Al-Qasatel Bridge
|
Latakia
Rehabilitation of Al-Qasatel Bridge
No items found.

Rehabilitation of Al-Qasatel Bridge (B46) on the Latakia–Ariha Motorway (M10), including a new 36-metre prestressed slab and a temporary detour.

Announcement :
05.05.2026
Updated on :
22.10.2026
Governorate:
Latakia
Sector :
Wadi al-Kanais Wells Equipping Project
|
Rural Damascus
Wadi al-Kanais Wells Equipping Project
Illustrative image
No items found.

Equipping six wells at Wadi al-Kanais in Rural Damascus and linking them to the Zarzar, Jdeidet Yabous and Deir al-Ashayer reservoirs, with UNICEF, to boost drinking water supply.

Sorouh Industrial City in Hassia
|
Homs
Sorouh Industrial City in Hassia
No items found.

Sorouh Industrial City in Hassia, Homs: an industrial and residential project of about 1.5 million sqm under two MoUs, now in the technical study phase.

Area:
1000000.0
m²
Announcement :
05.10.2026
Updated on :
15.10.2026
Governorate:
Homs
Sector :
Hasna and Shabrouniyeh Irrigation Canals in Rural Homs
|
Homs
Hasna and Shabrouniyeh Irrigation Canals in Rural Homs
Illustrative image
No items found.

Rehabilitation of the Hasna and Shabrouniyeh canals, branching from the Southern Kabir River in rural Homs with FAO, to irrigate about 750 hectares and serve around 20,000 beneficiaries.

Announcement :
14.10.2026
Updated on :
14.10.2026
Governorate:
Homs
Sector :
Dream Park Sports and Entertainment Complex, Daraa
|
Daraa
Dream Park Sports and Entertainment Complex, Daraa
Illustrative image
No items found.

Daraa Governorate announced Dream Park, its second investment project, featuring football and tennis pitches, sports halls, gardens and parks.

Developer :
Daraa Governorate
Announcement :
13.10.2026
Updated on :
13.10.2026
Governorate:
Daraa
Sector :
Syria China Cement Plant, Raqqa
|
Raqqa
Syria China Cement Plant, Raqqa
Illustrative image
No items found.

Cement and clinker plant by Syria's AlHasan Holding Group and a Chinese partner in Ain Issa, Raqqa. Foundation stone laid on 13 October 2026.

Announcement :
29.04.2026
Updated on :
13.10.2026
Governorate:
Raqqa
Sector :
Rehabilitation of the Qusayr Station Distribution Facility
|
Hama
Rehabilitation of the Qusayr Station Distribution Facility
Illustrative image
No items found.

Rehabilitation of the distribution facility at the Qusayr station, allowing drinking water to be drawn from Zeita Dam as a backup source for over 1.5 million people in 65 communities in Hama and Homs.

Announcement :
12.10.2026
Updated on :
12.10.2026
Governorate:
Hama
Sector :
Hasya Innovation and Technology City
|
Homs
Hasya Innovation and Technology City
Illustrative image
No items found.

The Hasya Industrial City administration signed an MoU with the Innovation and Technology City company to study developing a tech city on 1,540 hectares.

Area:
15400000.0
m²
Announcement :
12.10.2026
Updated on :
12.10.2026
Governorate:
Homs
Sector :
Deir ez-Zor Industrial City
|
Deir ez-Zor
Deir ez-Zor Industrial City
Illustrative image
No items found.

An industrial city in Deir ez-Zor covering about 1,260 hectares; plot subscriptions opened in October 2026, with a 200-hectare first phase offering over 140 hectares of plots.

Area:
12600000.0
m²
Announcement :
08.10.2026
Updated on :
08.10.2026
Governorate:
Deir ez-Zor
Sector :
Latakia Yachts & Marina
|
Latakia
Latakia Yachts & Marina
No items found.

An integrated coastal project in Latakia featuring residences, a yacht marina, international hotels and a beach club, developed by Eagle Hills.

Developer :
eagle hills
Announcement :
07.10.2026
Updated on :
07.10.2026
Governorate:
Latakia
Sector :
Damascus Heights Residential Project
|
Damascus
Damascus Heights Residential Project
No items found.

Damascus Heights is an integrated residential development in Damascus offering villas, apartments and townhouses inspired by traditional Damascene architecture.

Developer :
eagle hills
Area:
10000000.0
m²
Announcement :
07.10.2026
Updated on :
07.10.2026
Governorate:
Damascus
Sector :
Zeizoun–Basida 230 kV Line Rehabilitation in Idlib
|
Idlib
Zeizoun–Basida 230 kV Line Rehabilitation in Idlib
Illustrative image
No items found.

The Syrian Electricity Company is rehabilitating the 230 kV Zeizoun–Basida line in Idlib, a route of 80 towers, alongside Basida substation and 66 kV line maintenance.

Announcement :
06.10.2026
Updated on :
06.10.2026
Governorate:
Idlib
Sector :
Arab Gas Pipeline Phase Two Completion
|
Homs
Arab Gas Pipeline Phase Two Completion
No items found.

The Syrian Petroleum Company launched works on a new 186 km section of the Arab Gas Pipeline, completing a system of about 566 km from the Jordanian to the Turkish border, with an 11 million m³/day compression station.

Announcement :
29.09.2026
Updated on :
06.10.2026
Governorate:
Homs
Sector :
Al-Salama Border Crossing Expansion
|
Al-Salama Border Crossing Expansion
No items found.

Infrastructure upgrade of the Al-Salama border crossing with Türkiye in Aleppo Governorate, covering facilities, yards, internal roads and traffic lanes to raise capacity.

Announcement :
06.10.2026
Updated on :
06.10.2026
Sector :
Houran One Residential Project in Daraa
|
Daraa
Houran One Residential Project in Daraa
Illustrative image
No items found.

Houran One project launched in Daraa, featuring an 18-floor residential tower and a 3-floor commercial and medical building, with a 24-month construction period.

Area:
12000.0
m²
Announcement :
05.10.2026
Updated on :
05.10.2026
Governorate:
Daraa
Sector :
Free Zone and Dry Port
|
Idlib
Free Zone and Dry Port
Illustrative image
No items found.

The General Establishment for Free Zones signed a memorandum of understanding with BOMACO in May 2026 for a free zone and dry port in Idlib under a BOT model.

Announcement :
07.05.2026
Updated on :
05.10.2026
Governorate:
Idlib
Sector :
New Production Line at Muslimiyah Cement Plant
|
Aleppo
New Production Line at Muslimiyah Cement Plant
Illustrative image
No items found.

A 30-year BOT contract worth about USD 200 million to rebuild and operate the Muslimiyah cement plant near Aleppo, including a new 5,000 t/day clinker line.

Announcement :
03.10.2026
Updated on :
03.10.2026
Governorate:
Aleppo
Sector :
Rubble Removal and Recycling Project in Daraya and Douma
|
Rural Damascus
Rubble Removal and Recycling Project in Daraya and Douma
Illustrative image
No items found.

Project to remove about 85,000 m³ of rubble in Daraya and Douma, Rural Damascus, and recycle about 30,000 m³ of it in Daraya into blocks and interlocking pavers, supported by KSrelief.

Announcement :
01.10.2026
Updated on :
01.10.2026
Governorate:
Rural Damascus
Sector :
Southern Maarat al-Numan Bridge Rehabilitation
|
Idlib
Southern Maarat al-Numan Bridge Rehabilitation
No items found.

SEBCO is rehabilitating the southern Maarat al-Numan bridge on the Aleppo–Damascus M5 highway under the supervision of the General Establishment for Road Communications.

Announcement :
01.10.2026
Updated on :
01.10.2026
Governorate:
Idlib
Sector :
Hama Free Zone and Dry Port
|
Hama
Hama Free Zone and Dry Port
Illustrative image
No items found.

A proposed industrial, commercial and logistics free zone with a dry port west of Kafr Buhum, 18 km from Hama, under study by the Ports and Customs Authority and Hama Governorate.

Announcement :
01.10.2026
Updated on :
01.10.2026
Governorate:
Hama
Sector :
Umayyad Bridge and Tunnel Strengthening
|
Damascus
Umayyad Bridge and Tunnel Strengthening
Illustrative image
No items found.

A structural strengthening project for the Umayyad Bridge and Tunnel in Damascus, carried out by the governorate's Directorate of Technical Studies using over 150 cubic metres of reinforced concrete.

Announcement :
01.10.2026
Updated on :
01.10.2026
Governorate:
Damascus
Sector :
Jabal al-Hass Drinking Water Project
|
Aleppo
Jabal al-Hass Drinking Water Project
No items found.

A three-phase, roughly 55 km drinking water project for about 44 villages in Jabal al-Hass, southern Aleppo countryside, with a declared value of USD 551,000; phase one is under way.

Developer :
Aleppo Governorate
Announcement :
28.09.2026
Updated on :
28.09.2026
Governorate:
Aleppo
Sector :
Al-Olabi Real Estate Project
|
Aleppo
Al-Olabi Real Estate Project
Illustrative image
No items found.

The Al-Olabi residential project was launched in Zarbah near Aleppo on 28 September 2026 as the first under the new real estate development system, on the former Olabi Tex factory site.

Area:
40000.0
m²
Announcement :
28.09.2026
Updated on :
28.09.2026
Governorate:
Aleppo
Sector :
Rihab Al-Shahba
|
Aleppo
Rihab Al-Shahba
Illustrative image
No items found.

A planned residential city on the western axis of Aleppo towards Khan al-Asal, on about 457,000 square metres. Aleppo Governorate puts it at around 112 residential buildings and some 4,000 housing units; the plan also includes schools, health centres, a mosque, commercial areas and green space.

Developer :
RIHAB AL SHAHBA
Area:
457000.0
m²
Announcement :
11.09.2026
Updated on :
28.09.2026
Governorate:
Aleppo
Sector :
Latakia International Airport Rehabilitation
|
Latakia
Latakia International Airport Rehabilitation
No items found.

Rehabilitation of Latakia International Airport's buildings, facilities and equipment to return it to service, carried out by the General Authority of Civil Aviation and Air Transport since September 2026.

Announcement :
27.09.2026
Updated on :
27.09.2026
Governorate:
Latakia
Sector :
Zamzam Towers
|
Aleppo
Zamzam Towers
No items found.

A residential complex of 18 towers and 936 apartments of 127–292 m² in Bishqatin, Aleppo, due for delivery in September 2029.

Area:
159444.0
m²
Announcement :
11.08.2026
Updated on :
27.09.2026
Governorate:
Aleppo
Sector :
Suwayiyah Bridge in Albukamal
|
Deir ez-Zor
Suwayiyah Bridge in Albukamal
Illustrative image
No items found.

Construction of the Suwayiyah Bridge in Albukamal, eastern Deir ez-Zor, supervised by the Ministry of Transport and executed by SEBCO; works began in September 2026.

Announcement :
25.09.2026
Updated on :
25.09.2026
Governorate:
Deir ez-Zor
Sector :
Industrial City in Al-Najeeh
|
Daraa
Industrial City in Al-Najeeh
Illustrative image
No items found.

A planned industrial city in Al-Najeeh, in northern rural Daraa near the Damascus–Daraa highway. Al-Najeeh was agreed as the preliminary site in July 2026 with detailed studies to follow, and in September 2026 the Ministry of Economy and Industry put its area at 1,264 hectares.

Area:
12640000.0
m²
Announcement :
17.06.2025
Updated on :
25.09.2026
Governorate:
Daraa
Sector :
Engineers' Oasis Housing Project
|
Rural Damascus
Engineers' Oasis Housing Project
No items found.

A housing complex of the Syrian Engineers Syndicate and its retirement fund in Jdeidet Artouz, Rif Dimashq, with 13 towers and about 600 apartments, built by SEBCO.

Area:
30000.0
m²
Announcement :
24.09.2026
Updated on :
24.09.2026
Governorate:
Rural Damascus
Sector :
Qassioun Journey
|
Damascus
Qassioun Journey
No items found.

Damascus Governorate and the Ministry of Tourism launched Qassioun Journey on 21 April 2026 to open Mount Qassioun as a public cultural and tourism destination; the governor announced over 7,000 expected jobs. Three banks finance the final phase, and he targets an opening in summer 2027.

Announcement :
21.04.2026
Updated on :
24.09.2026
Governorate:
Damascus
Sector :
Aleppo International Airport Development
|
Aleppo
Aleppo International Airport Development
No items found.

Development and operation of Aleppo International Airport and construction of a new airport in phases, under a February 2026 agreement with the Saudi Elaf Investment Fund led by BinDawood.

Developer :
BinDawood Holding
Announcement :
07.02.2026
Updated on :
24.09.2026
Governorate:
Aleppo
Sector :
Mezzeh Airport Conversion and Modernization
|
Damascus
Mezzeh Airport Conversion and Modernization
No items found.

Plan to convert Mezzeh Airport in Damascus to a limited civil airport for private and executive aviation; initial works began in September 2026, per SANA.

Area:
6800000.0
m²
Announcement :
27.07.2025
Updated on :
23.09.2026
Governorate:
Damascus
Sector :
Ashrafiyeh Road Rehabilitation Jisr al-Touta
|
Hama
Ashrafiyeh Road Rehabilitation Jisr al-Touta
Illustrative image
No items found.

A road of about 10 km linking Ashrafiyeh and Jisr al-Touta in Hama's Ghab Plain. SANA reported that works began in April 2026 and it serves some 100,000 people.

Developer :
Hama Governorate
Announcement :
07.04.2026
Updated on :
23.09.2026
Governorate:
Hama
Sector :
Deir Ali Power Plant Rehabilitation
|
Rural Damascus
Deir Ali Power Plant Rehabilitation
Illustrative image
No items found.

A USD 10.7 million project funded by Italy and Norway and implemented by UNDP to rehabilitate Extension II of the Deir Ali power plant in Rif Dimashq, restoring about 120 MW to the grid.

Announcement :
22.09.2026
Updated on :
22.09.2026
Governorate:
Rural Damascus
Sector :
Rehabilitation of the National Hospital in Maarat al-Numan
|
Idlib
Rehabilitation of the National Hospital in Maarat al-Numan
No items found.

Restoration of the National Hospital in Maarat al-Numan, rural Idlib, starting with an engineering study and ground-floor rehabilitation, with SEBCO taking part.

Announcement :
22.09.2026
Updated on :
22.09.2026
Governorate:
Idlib
Sector :
Damascus-Daraa Road Lighting Project
|
Daraa
Damascus-Daraa Road Lighting Project
Illustrative image
No items found.

Lighting works on the Damascus–Daraa international highway to improve night-time visibility and traffic safety, from maintenance on the Damascus section in 2025 to the lighting infrastructure included in the 2026 contract to rehabilitate the Nasib–Damascus highway.

Announcement :
21.10.2025
Updated on :
22.09.2026
Governorate:
Daraa
Sector :
Sham View
|
Rural Damascus
Sham View
No items found.

Sham View is a major urban development project located between Qudsaya and Dummar

Area:
1780000.0
m²
Announcement :
24.08.2026
Updated on :
22.09.2026
Governorate:
Rural Damascus
Sector :
Al-Khalij Land Project in Daraya
|
Rural Damascus
Al-Khalij Land Project in Daraya
No items found.

An initial plan to redevelop the Al-Khalij area north of Daraya in Rif Dimashq at a cost of nearly $2 billion with 19,000 housing units.

Area:
1500000.0
m²
Announcement :
21.09.2026
Updated on :
21.09.2026
Governorate:
Rural Damascus
Sector :
Rehabilitation of the Tartus Port to Talkalkh Rail Line
|
Tartus
Rehabilitation of the Tartus Port to Talkalkh Rail Line
Illustrative image
No items found.

Rehabilitation of the Tartus port to Talkalkh rail line in western Homs since April 2026, replacing rails and sleepers. Final phase was under way in September.

Announcement :
23.04.2026
Updated on :
21.09.2026
Governorate:
Tartus
Sector :
Latakia Pressure Booster Station Rehabilitation
|
Latakia
Latakia Pressure Booster Station Rehabilitation
Illustrative image
No items found.

Rehabilitation of a pressure booster station in Latakia, replacing its pumps with more efficient units to stabilise water supply to ten neighbourhoods home to about 350,000 people.

Basilia City Alternative Housing Project
|
Damascus
Basilia City Alternative Housing Project
Illustrative image
No items found.

Residential towers in the Basilia City alternative housing project in Damascus, built by SEBCO; structures have reached the 12th floor in tower A6 and the 4th floor in tower H13.

Announcement :
20.09.2026
Updated on :
20.09.2026
Governorate:
Damascus
Sector :
Um al-Bashaer Complex in Saraqib
|
Idlib
Um al-Bashaer Complex in Saraqib
Illustrative image
No items found.

KSrelief signed a programme on 20 September 2026 with a Syrian civil society organisation to build and equip the Um al-Bashaer health and community complex in Saraqib, rural Idlib, expected to benefit more than 100,000 people.

Announcement :
20.09.2026
Updated on :
20.09.2026
Governorate:
Idlib
Sector :
Al-Kasra Drinking Water Stations Rehabilitation
|
Deir ez-Zor
Al-Kasra Drinking Water Stations Rehabilitation
Illustrative image
No items found.

Rehabilitation of the raw and treated water stations in Al-Kasra, rural Deir ez-Zor, with ACTED, including a 420 m³ ground tank, new pumps and a disinfection system.

New Damascus
|
Damascus
New Damascus
Illustrative image
No items found.

A mixed-use development by the Syrian Sovereign Fund and Arada on four million square metres near Mezzeh, with 11,000 homes, a hospital and schools.

Area:
4000000.0
m²
Announcement :
19.09.2026
Updated on :
19.09.2026
Governorate:
Damascus
Sector :
Barq Net Fibre Project in Dummar
|
Damascus
Barq Net Fibre Project in Dummar
Illustrative image
No items found.

Extending the fibre-to-the-home network under the Barq Net project in the Dummar Project area of Damascus, serving about 35 buildings averaging 40 apartments each.

Developer :
Syrian Telecom
Announcement :
01.06.2025
Updated on :
19.09.2026
Governorate:
Damascus
Sector :
Raqqa Craft and Industrial Zone
|
Raqqa
Raqqa Craft and Industrial Zone
Illustrative image
No items found.

Raqqa Governorate and the Syrian Investment Authority signed a contract with Kayan Holding and Turkish firm MYB on 3 September 2026 for a craft and industrial zone at Sahlat al-Banat, about 4 km from Raqqa, after a June memorandum.

Announcement :
14.06.2026
Updated on :
19.09.2026
Governorate:
Raqqa
Sector :
Takiyeh–Zabadani Axis Rehabilitation
|
Rural Damascus
Takiyeh–Zabadani Axis Rehabilitation
No items found.

Rehabilitation of the 16 km Takiyeh–Zabadani axis in Rif Dimashq from the Zabadani bridge, adding a green median and sidewalks under the “Our Countryside Is More Beautiful” campaign.

Announcement :
18.09.2026
Updated on :
18.09.2026
Governorate:
Rural Damascus
Sector :
Darkush–Jisr al-Shughur Road Rehabilitation
|
Idlib
Darkush–Jisr al-Shughur Road Rehabilitation
Illustrative image
No items found.

Rehabilitation of the roughly 25 km Darkush–Jisr al-Shughur road in Idlib governorate: milling the old asphalt, laying a new 6 cm overlay and road marking.

Announcement :
18.09.2026
Updated on :
18.09.2026
Governorate:
Idlib
Sector :
Ghranata-Kafarnan Bridge Rehabilitation
|
Homs
Ghranata-Kafarnan Bridge Rehabilitation
Illustrative image
No items found.

The Syrian Building and Construction Establishment's Homs branch has begun rehabilitating the Ghranata-Kafarnan bridge over the Orontes River, valued at 38 million SYP over 200 days.

Announcement :
17.09.2026
Updated on :
17.09.2026
Governorate:
Homs
Sector :
Al-Bab Administrative City and University Faculties
|
Aleppo
Al-Bab Administrative City and University Faculties
No items found.

Administrative city, university campus and residential neighbourhood at Jabal Sheikh Aqil, Al-Bab, eastern rural Aleppo, on 200 dunams of waqf land according to the Ministry of Endowments. Foundation stone laid in July 2026; administrative city works began in September 2026.

Area:
200000.0
m²
Announcement :
21.07.2026
Updated on :
16.09.2026
Governorate:
Aleppo
Sector :
Saudi–Türkiye Regional Railway
|
Damascus
Saudi–Türkiye Regional Railway
Illustrative image
No items found.

Planned rail link from Saudi Arabia via Jordan and Syria to Türkiye and Europe. Türkiye's minister targets 3–4 years; about $100M for the Türkiye–Aleppo line.

Announcement :
07.04.2026
Updated on :
15.09.2026
Governorate:
Damascus
Sector :
Rehabilitation of Al-Bahra Roundabout Junction, Hama
|
Hama
Rehabilitation of Al-Bahra Roundabout Junction, Hama
No items found.

Rehabilitation of the Al-Bahra junction in Hama, part of phase one of the Hama Artery project: the roundabout is replaced with a modern traffic junction to ease congestion on the city's main axis.

Announcement :
13.09.2026
Updated on :
13.09.2026
Governorate:
Hama
Sector :
SilkLink Fiber Optic Cable Project
|
Damascus
SilkLink Fiber Optic Cable Project
Illustrative image
No items found.

National fiber-optic backbone of about 4,500 km across Syria, a partnership of stc and the Syrian Sovereign Fund, with a cable landing station in Tartus.

Developer :
stc
Announcement :
13.05.2025
Updated on :
13.09.2026
Governorate:
Damascus
Sector :
Hama–Salamiyah Road Rehabilitation
|
Hama
Hama–Salamiyah Road Rehabilitation
No items found.

Maintenance and rehabilitation of a 10-km section of the Hama–Salamiyah road, implemented by the General Establishment for Building and Construction, supervised by the General Establishment for Road Communications.

Announcement :
12.09.2026
Updated on :
12.09.2026
Governorate:
Hama
Sector :
Rehabilitation of Yabroud Hospital
|
Rural Damascus
Rehabilitation of Yabroud Hospital
Illustrative image
No items found.

Rehabilitation of Yabroud Hospital in Rif Dimashq under the “Rifna Bistahel” campaign, adding a CT scanner, C-arm imaging, oxygen units, doctors’ housing and an activated care unit.

Announcement :
09.09.2026
Updated on :
09.09.2026
Governorate:
Rural Damascus
Sector :
Faculty of Arts and Humanities Building, Tartus
|
Tartus
Faculty of Arts and Humanities Building, Tartus
No items found.

A new Faculty of Arts and Humanities building in Tartus, executed by SEBCO, with works currently at the footings, pile caps and columns stage.

Announcement :
09.09.2026
Updated on :
09.09.2026
Governorate:
Tartus
Sector :
Tarif Water Station Rehabilitation
|
Deir ez-Zor
Tarif Water Station Rehabilitation
Illustrative image
No items found.

Rehabilitation of the Tarif water station in western rural Deir ez-Zor, adding a 302-panel solar system and civil and electrical works, by Deir ez-Zor Water Company with Oxfam.

Announcement :
08.09.2026
Updated on :
08.09.2026
Governorate:
Deir ez-Zor
Sector :
Rehabilitation of Deir ez-Zor Civil Airport
|
Deir ez-Zor
Rehabilitation of Deir ez-Zor Civil Airport
Illustrative image
No items found.

Rehabilitation of Deir ez-Zor Civil Airport after more than a decade out of civilian service. Works began in February 2026, and the airport reopened on 5 August 2026 with scheduled flights from Damascus and Kuwait.

Announcement :
04.02.2026
Updated on :
08.09.2026
Governorate:
Deir ez-Zor
Sector :
Bab al-Hawa Border Crossing Rehabilitation and Expansion
|
Idlib
Bab al-Hawa Border Crossing Rehabilitation and Expansion
No items found.

Rehabilitation and expansion of the Bab al-Hawa border crossing with Türkiye in Idlib Governorate, over about 200,000 square metres. Works began in spring 2026 and were still under way in September 2026.

Area:
200000.0
m²
Announcement :
11.01.2026
Updated on :
08.09.2026
Governorate:
Idlib
Sector :
Al-Jalaa Palm Farm Development in Albukamal
|
Deir ez-Zor
Al-Jalaa Palm Farm Development in Albukamal
Illustrative image
No items found.

Rehabilitation of the Al-Jalaa date palm propagation farm in rural Albukamal (about 2,000 dunums, 12,000 palms), carried out by Relief American Fund under a Ministry of Agriculture contract.

Announcement :
07.09.2026
Updated on :
07.09.2026
Governorate:
Deir ez-Zor
Sector :
Ain al-Zarqa Water Station Rehabilitation, Idlib
|
Idlib
Ain al-Zarqa Water Station Rehabilitation, Idlib
Illustrative image
No items found.

Rebuilding and rehabilitation of the Ain al-Zarqa water station in Idlib governorate, a USD 40 million World Bank-funded project; the station supplies drinking water to about 70% of the governorate.

Announcement :
07.09.2026
Updated on :
07.09.2026
Governorate:
Idlib
Sector :
Banias Refinery Overhaul
|
Tartus
Banias Refinery Overhaul
Illustrative image
No items found.

A comprehensive overhaul of Banias Refinery in Tartus by the Syrian Petroleum Company to raise capacity from about 80,000 to 130,000 barrels per day, including reactor replacement.

Announcement :
07.09.2026
Updated on :
07.09.2026
Governorate:
Tartus
Sector :
Al-Lajj and Basida Water Stations in Rural Idlib
|
Idlib
Al-Lajj and Basida Water Stations in Rural Idlib
No items found.

Rehabilitation of the Al-Lajj and Basida water stations in rural Idlib, with 31 wells and solar power, supplying drinking water to about 430,000 people in Jabal al-Zawiya and Maarat al-Numan.

Announcement :
06.09.2026
Updated on :
06.09.2026
Governorate:
Idlib
Sector :
Iraq–Syria Oil Pipeline to Baniyas
|
Tartus
Iraq–Syria Oil Pipeline to Baniyas
Illustrative image
No items found.

Rehabilitation of the Iraq–Syria crude oil pipeline to the port of Baniyas, to be carried out by Chevron according to Iraq's state news agency, with an initial capacity of 2 million barrels a day.

Developer :
Chevron (US)
Announcement :
17.07.2026
Updated on :
03.09.2026
Governorate:
Tartus
Sector :
Sheikh Najjar Industrial Land Development
|
Aleppo
Sheikh Najjar Industrial Land Development
Illustrative image
No items found.

Development of first-category land in the Sheikh Najjar Industrial City, Aleppo, with integrated roads, power, water, sewage and telecom infrastructure to attract industrial investment.

Announcement :
03.09.2026
Updated on :
03.09.2026
Governorate:
Aleppo
Sector :
Damascus–Deir ez-Zor Highway Rehabilitation
|
Deir ez-Zor
Damascus–Deir ez-Zor Highway Rehabilitation
Illustrative image
No items found.

Rehabilitation of the Damascus–Palmyra–Deir ez-Zor road and construction of a second carriageway to make it a dual carriageway. In August 2026 the contract was awarded to Saudi Arabia's Al-Rawaf and Syria's Al-Kawati for about USD 300 million, with a 780-day execution period.

Announcement :
01.08.2026
Updated on :
03.09.2026
Governorate:
Deir ez-Zor
Sector :
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.