Damascus Governorate logo | Rebuilding Syria Platform
Damascus Governorate

Umayyad Bridge and Tunnel Strengthening

Structural strengthening of a central Damascus interchange
Damascus
Architecture :
Civil Engineering :
Developer :
No items found.
Area:
m²
Announcement :
01.10.2026
Update :
01.10.2026
umayyad-bridge-tunnel-strengthening-damascus-542801
36.2770
33.5134

About the Project

A structural strengthening project for the Umayyad Bridge and Tunnel in Damascus, carried out by the Directorate of Technical Studies of Damascus Governorate together with staff from the governorate's directorates.

Scope of Works

  • Structural works to strengthen the Umayyad Tunnel as part of the Umayyad Bridge and Tunnel project.
  • More than 150 cubic metres of reinforced concrete have been used in the works.

Parties

  • Implementing body: Directorate of Technical Studies, Damascus Governorate.
  • In cooperation with: staff of the Damascus Governorate directorates.

Current Stage

On 1 October 2026, Damascus Governorate announced that strengthening works on site had resumed, and published a video showing the stages of work.

Share this post
Related Org. / Co.
Add Your Project!
Interested?
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.