The Damascus–Daraa Highway Lighting Project is one of the vital service projects aimed at improving traffic safety and reducing accidents on this vital international corridor.Here are the key details and information regarding the project:1. Project Scope and Work Location:• Starting Point: Fieldwork, including the installation of poles and lighting, begins from the Mankat Al-Hatab checkpoint toward designated points along the highway.• Spatial Objective: Provide clear visibility for cars and trucks traveling at night between the capital, Damascus, and Daraa Governorate, especially at high-risk points and major intersections.2. Power Supply Mechanism and Execution:• Electrical Power Supply: Parts of the project rely on connection to the 'Golden Line' (the line exempt from electricity rationing) to ensure continuous lighting throughout the night without interruption.• Alternative Energy Solutions: Highway operations are integrated with local projects and initiatives in towns and entrances across Daraa using solar-powered lighting units (equipped with integrated panels and batteries) to ensure sustainability and relieve pressure on the public grid.3. Objectives and Expected Outcomes:1. Reducing Traffic Accidents: Provide adequate lighting and clear visibility for drivers at night on a highway with heavy freight and transit traffic.2. Enhancing Safety and Security: Increase safety and field security along the highway connecting both governorates.3. Facilitating Trade and Monitoring: Support economic activity and facilitate transit between Damascus, Daraa, and border crossings.
