Architecture :
Civil Engineering :
Developer :
No items found.
Area:
m²
Announcement :
08.09.2026
Update :
08.09.2026
tarif-water-station-rehabilitation-deir-ez-zor-591916

About the project

Deir ez-Zor Water Company, in cooperation with Oxfam, is rehabilitating the Tarif water station, a drinking-water pumping station in the al-Tabni area of western rural Deir ez-Zor, near the Euphrates River.

Scope of works

  • Installation of a solar power system of 302 panels rated at 725 W.
  • Civil, electrical and rehabilitation works at the station.

Objective

To support the station's continuous operation and strengthen drinking-water services in the area.

Current stage

Works are under way, as announced by Deir ez-Zor Governorate on 8 September 2026.

Share this post
Related Org. / Co.
Add Your Project!
Interested?
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.