The Syrian Establishment for Construction and Building (SEBCO), Damascus branch, continues work on its residential project in the Al-Furn suburb of Adra, made up of 8 residential towers. The works aim to build housing units including the basic structural and water installations.
Each tower consists of:
Each tower is also equipped with two water tanks, one elevated and one at ground level next to the building.
The concrete structure is complete in towers (1) and (5), from the raft and foundations to the columns, walls and slabs, up to the ninth floor. Blockwork has also been completed in tower (5).
In tower (7), the concrete works for the basement and ground floor are done, and the columns and shear walls of the first floor were recently poured, ahead of continuing structural work on the upper floors.
The works form part of the establishment's residential sector projects, which aim to deliver multi-storey buildings in successive structural phases, supporting the supply of new housing units in the Adra area.