Deir ez-Zor Reinforces Earthen Bridge as Precaution After Euphrates Water Level Rise

18.08.2026
Deir ez-Zor Reinforces Earthen Bridge as Precaution After Euphrates Water Level Rise

The emergency response committee in Deir ez-Zor governorate, through its technical and service teams, has begun work to reinforce and raise the level of the earthen bridge in Deir ez-Zor city, following a rise in the water level of the Euphrates River.

Scope of Works

The works include installing metal culverts along the length of the earthen bridge, followed by soil backfilling to level the bridge surface.

Purpose of the Measure

The measure aims to enhance public safety and facilitate the flow of water in the area.

Responsible Authority

Deir ez-Zor governorate is overseeing the implementation of these works through its emergency response committee.

Share this post
Published on
18.08.2026
Keywords
Deir ez-Zor, earthen bridge, Euphrates River, emergency response

Read More !

News
Saudi Fund Finances Syria's Power, Water and Housing Projects
Saudi Fund Finances Syria's Power, Water and Housing Projects
Read More
Read More
Blogs
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
Read More
Read More
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.
Updates