66 kV Line Energised from Idlib to Maarat al-Numan

16.11.2026
66 kV Line Energised from Idlib to Maarat al-Numan

The General Electricity Company announced that it has begun supplying power to a 66 kV high-voltage line, as part of a plan to rehabilitate the electricity sector's infrastructure and improve services.

Route of the Line

The line starts in Idlib and passes through the following areas on its way to the Basida station:

  • Saraqib
  • Maarat al-Numan and its eastern countryside
  • Sinjar

Project Framework

The announcement falls under the plan to rehabilitate the electricity sector's infrastructure, according to the company's statement published by Idlib Governorate.

Notice to Residents

The company called on all residents along the route to stay well away from the line's safety corridor and the electricity towers, and not to approach or tamper with them, to avoid risks to their safety and that of their children.

Share this post
Source

Source: Idlib Governorate

Published on
16.11.2026
Keywords
high-voltage line, 66 kV, General Electricity Company, Idlib, Maarat al-Numan, Basida station

Read More !

News
Saudi Fund Finances Syria's Power, Water and Housing Projects
Saudi Fund Finances Syria's Power, Water and Housing Projects
Read More
Read More
Blogs
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
Read More
Read More
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.
Updates