Maintenance and Rehabilitation Begins on the 4.3 km Umm al-Mayadhen–Nassib Road in Daraa

13.08.2026
Maintenance and Rehabilitation Begins on the 4.3 km Umm al-Mayadhen–Nassib Road in Daraa
*Illustrative image

Works Under Way

Daraa Governorate announced the start of maintenance and rehabilitation works on the Umm al-Mayadhen–Nassib arterial road in Daraa province. The announcement says the works are intended to improve traffic safety.

Road Specifications

  • Length: 4.3 km
  • Width: 8 to 11 metres

The announcement, published with a two-minute video, does not state the contractor, the funding source, the cost or the completion date.

Share this post
Published on
13.08.2026
Keywords
Daraa, Umm al-Mayadhen, Nassib, road rehabilitation, road maintenance, traffic safety, infrastructure

Read More !

Blogs
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
Read More
Read More
News
Idlib Brings 30 Rehabilitated Health Centres Into Service
Idlib Brings 30 Rehabilitated Health Centres Into Service
Read More
Read More
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.
Updates