Aleppo Water Directorate Starts Canal Repairs at Maskanah East Irrigation Project

03.11.2026

Start of works

The Water Resources Directorate in Aleppo has begun preparing and treating breaks in the canals of the fourth farm of the Maskanah East project in the eastern Aleppo countryside. The announcement describes this as a step ahead of rehabilitating the project's main and secondary irrigation networks.

Scope of works

  • Main canals: treating breaks.
  • Secondary canals: repairing subsidence points and restoring the canals to the required levels.
  • Equipment: cranes, crawler excavators and wheel excavators.

The stated aim is to improve water flow and reduce losses, so that irrigation water reaches agricultural land more regularly.

What the announcement does not state

The announcement does not give the length of canal covered, the cost, the funding source, the contractor or the irrigated area.

Share this post
Published on
03.11.2026
Keywords
Aleppo, Maskanah East, irrigation, canals, Water Resources Directorate, agriculture

Read More !

Blogs
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
Read More
Read More
News
Idlib Brings 30 Rehabilitated Health Centres Into Service
Idlib Brings 30 Rehabilitated Health Centres Into Service
Read More
Read More
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.
Updates