In volumetric modular construction, a building is assembled from three-dimensional modules on engineered steel frames, with building components fitted in the factory. Tamimi PEB combines hot-rolled and light gauge steel; the modules leave the factory 80 to 85% complete and are installed on site.
The system holds BOPAS accreditation from LRQA for hot-rolled steel post and beam frame modules with light gauge steel frame. The scope covers design, manufacture and construction, with a 60-year durability and maintenance assessment.
At its Jubail facility, Tamimi PEB built a G+5 residential building of 24 apartments entirely from volumetric modules in 24 weeks, design included.
Structure: hot-rolled steel with light gauge steel
Factory completion: 80 to 85% before dispatch
Suitable height: low rise to high rise
Useful life: 60 years
Accreditation: BOPAS (LRQA)
Manufactured by Tamimi PEB in Saudi Arabia (Jubail and NEOM factories)
Related Products

Light gauge steel housing, 90 to 95% complete when it leaves the factory, for buildings of up to G+2.

Corporate offices, administrative buildings, retail spaces and multi-purpose facilities in modular and steel systems.

Modular hospitals, clinics, medical facilities, schools and education buildings made from factory-built modules.
