


Tamimi PEB is a Saudi manufacturer and turnkey contractor based in Jubail. It designs, produces and installs pre-engineered steel buildings, light gauge steel and volumetric modular systems, and builds concrete housing with tunnel formwork. Its portfolio includes workforce villages and residential communities for projects such as NEOM and AMAALA.
Saudi Arabia
-
Jubail
About
Tamimi Pre-Engineered Buildings Factory Co. (Tamimi PEB) is a Saudi manufacturing and construction company headquartered in Jubail. Working as main contractor and developer, it brings design, factory production, supply, installation and handover together under one responsibility, for residential, commercial, industrial, hospitality and workforce accommodation projects.
Tamimi PEB covers the full project lifecycle: concept and design, approvals and permits, civil and infrastructure works, factory production of building modules, logistics and site assembly, commissioning and handover, and operations and maintenance. Producing in the factory while the site is being prepared shortens the construction programme and gives closer control over quality.
The automated factory in Jubail covers 55,000 m², including a 9,500 m² production area with cold-formed steel roll-forming lines, an expanded polystyrene (EPS) plant and an EPS sandwich panel line. A second automated factory at NEOM was set up to produce up to 25 modules per day. According to company figures, combined capacity exceeds 100 modules per day, with more than 48,000 modules manufactured across Saudi Arabia.
Giga-projects and developers, oil, gas and energy, EPC and construction contractors, government and public entities, hospitality and tourism, and industry and logistics.
Services
Previous projects

Volumetric modular · 24 apartments in 24 weeks
A six-storey residential building of 24 apartments at Tamimi PEB's Jubail facility, built entirely from volumetric modules in 24 weeks, design included.

Formwork concrete · 200 family villas
200 family villas in Al-Ahsa for the National Housing Company and the Ministry of Housing, designed and built in formwork concrete over 23,092 m².

Design and build · 5,054 management staff
A design and build community for NEOM Company on 226,000 m², with modular accommodation and pre-engineered buildings for 5,054 management staff.

Design, build, operate · up to 11,000 personnel
Modular camp buildings and pre-engineered structures for NEOM Company at Trojena, over 872,000 m², housing up to 11,000 personnel.

Design, build, operate and maintain · 20,000 personnel
A 856,000 m² modular village at NEOM for 20,000 personnel, under a design, build, operate and maintain contract that includes catering.

Design and build · 524,000 m²
A 524,000 m² modular construction village designed and built for Amaala Company, housing more than 15,500 personnel with buildings and infrastructure.

Design and build · 23,000 m²
A five-star modular residential compound designed and built for Tamimi Global Company Limited, with villas and studios for 161 VIP guests and other staff.
Products

Factory-made toilet and bathroom pods and modular MEP pods, delivered finished for installation.
Modular Buildings

Prefabricated site offices, portable buildings and support units for construction sites and industrial operations.
Modular Buildings

Villas, apartments, residential compounds and family housing, in modular steel or tunnel formwork concrete.
Modular Buildings

Hotels, resorts, restaurants and guest accommodation built with volumetric modules or tunnel formwork.
Modular Buildings

Corporate offices, administrative buildings, retail spaces and multi-purpose facilities in modular and steel systems.
Modular Buildings

Modular hospitals, clinics, medical facilities, schools and education buildings made from factory-built modules.
Modular Buildings

Turnkey accommodation villages: workers' camps, staff villages, management housing and their facilities.
Modular Buildings

EPS sandwich panels and insulated wall and roof systems, produced at the Jubail factory.
Insulation & Waterproofing

Engineered steel building systems with large clear spans for industry, logistics, workshops and commercial use.
Steel & Metals

Reusable steel tunnel forms that cast concrete walls and slabs in one pour, combined with factory-made MEP pods.
Modular Buildings

BOPAS-accredited steel modules, 80 to 85% complete in the factory, for low to high-rise buildings with a 60-year life.
Modular Buildings

Light gauge steel housing, 90 to 95% complete when it leaves the factory, for buildings of up to G+2.
Modular Buildings
NEws
Opinions & Analysis
