

Al-Ajam Engineering and HVAC Systems has extensive experience in Syria, having implemented advanced projects in pharmaceutical factories, hospitals, hotels, and industrial facilities. The company specializes in cleanroom systems, air handling units (AHUs), ventilation, and refrigeration systems, adhering to GMP, WHO, ASHRAE, and ISO standards. Al-Ajam focuses on executing large-scale projects with high quality and reliability, while providing comprehensive engineering support.
Turkey
-
Adana
Services
projects
Previous projects

Design and execution of advanced central HVAC and air distribution systems for the prestigious Four Seasons Hotel in Damascus.

Installation of high-efficiency filtered AHUs and process exhaust systems for NCPI's pharmaceutical plant in Khan Al-Asal, Aleppo, by Alajam Company.

HVAC, AHU and advanced filtered duct networks for Sandi Pharma at Hayan Industrial City, designed and installed by Alajam Company.

Turnkey central HVAC and GMP-grade air handling units for Al-Saad Pharmaceutical Industries in Al-Mansoura, Aleppo, delivered by Alajam Company.
Products

Cleanroom pass box with HEPA filtration, door interlock, and pressure gauge with alarm for material transfer
Heating & Cooling

Mobile pharma-grade cold room, -40 to +30 C, ducted airflow, optional online monitoring with SMS and email alerts
Heating & Cooling

Industrial water cooling tower in corrosion-resistant construction, modular sizing for plants, refineries, and large HVAC
Heating & Cooling

Modular water-cooled industrial chiller with variable-speed compressors and eco-refrigerant for plants and data centers
Heating & Cooling

HVAC DP gauge, -68 to 103 kPa range, 15 PSI rated, +/-2% FS accuracy, -7 to 60 C, 0.55 kg grey housing
Heating & Cooling

Ceiling-mounted industrial dehumidifier 10-20 kg/h with computerized control, 5-38 C, 5-90% RH range
Heating & Cooling

Industrial silica-gel adsorption dehumidifier on Trisorp Dual principle, dual fans, PTC regeneration, Duoventic control
Heating & Cooling

Mobile refrigerant dehumidifier up to 50 L/24h, 580 m3/h, 0.6 kW, R-410A, 52 dB(A) at 1 m, 220-240 V / 50 Hz
Heating & Cooling

Hygienic AHU 1,600-50,000 m3/h with silica-gel rotor, HEPA filtration, heat recovery, and weatherproof option
Heating & Cooling

ISO Class 5 laminar flow cabin with H13/H14 HEPA two-stage filtration, FlowGrid fans, and BMS contacts
Heating & Cooling

EN 1822 / ISO 29463 certified H13-H14 HEPA ceiling filter with anodized aluminum frame and glass-fiber media
Heating & Cooling

Third-generation high-temperature silica gel desiccant rotor with 82% sizing rate, VITON seals, and chain drive
Heating & Cooling
NEws
