Maintenance project for the asphalt layer, paving, curbs, sidewalks, and accessories in various areas in the Industrial City of Aleppo

Maintenance project for the asphalt layer, paving, curbs, sidewalks, and accessories in various areas in the Industrial City of Aleppo
Reference
101204
Currency:
SYP
Initial Estimation:
4908000000
Governorate:
Aleppo
Applying Method :
حضوري | In-person
Puplish :
05.03.2026
Deadline :
12.04.2026

overview

  • First-time sealed bid tender for the maintenance of asphalt, paving, and sidewalks in the Industrial City of Aleppo (Phase 2). Initial Bond: 5% of the estimated value. Final Bond: 10% of the award value. Delay Penalty: 0.1%. Warranty Period: One calendar year. Required Contractor Class: (Excellent) Roads and Bridges specialty. Bid Validity: 120 days. File Cost: 2,000 SYP.
  • ‍