overview
Implementation of a paving and asphalting project within the Al-Barqiyah town sector. The contractor must bear the cost of topographic surveys and C.B.R tests, and must appoint a resident engineer if they are not one themselves
How to Apply
Submit sealed bids to the Town's Diwan with all necessary supporting documents. The initial guarantee (5%) is only accepted as a certified check or bank guarantee. The project file can be purchased for 10,000 SYP. The bid validity period is 30 days