*Illustrative image

Electrical Works Tender by Military Construction in Al-Nabk

Electrical Works Tender by Military Construction in Al-Nabk

overview

The contracting office of the Military Construction Directorate is seeking qualified contractors to carry out electrical works under project No. 66, in line with the technical conditions of the electricity establishment in Rif Dimashq Governorate. Price offers are being solicited on a full-speed basis.

Scope of Works

The contract covers the follow-up of electrical works in Rif Dimashq Governorate (Al-Nabk and Dnehat) within an execution period of no more than 45 days.

  • Full compliance with the recommendations of the engineering supervision body.
  • Compliance with the technical specifications of the electricity establishment.

The execution period runs from the date of approval and the commencement order. The shorter of one and a half months or the period proposed by the contractor is adopted.

Eligibility and Evaluation

Applicants submit a technical file in a sealed envelope scored out of 100 points, with a minimum of 60 points required to proceed to the opening of financial offers. The items are as follows:

  • Commercial or industrial register (mandatory, 10 points, offer rejected without it).
  • Contractors' union membership (mandatory, 10 points, offer rejected without it).
  • Contracts or files of similar work (mandatory, 30 points) stating project name, financial scale, client and year.
  • Approved technical staff (mandatory, 20 points) with ID copies, engineering certificates and CVs.
  • Previous work with the Military Construction Directorate (non-mandatory, 10 points).
  • Company structure (non-mandatory, 10 points).
  • Preliminary execution plan with a suitable timeline (non-mandatory, 10 points).

A sealed financial offer is also submitted for each site, scored out of 100 points: 90 for detailed unit prices in US dollars (mandatory), 5 for price analysis and 5 for an execution period shorter than one and a half months.

Award and Financial Terms

The award goes to the lowest-priced offer that ranks highest in the results, and the Directorate may negotiate with contractors to reach the price set by the branch.

  • A pledge letter to honour the submitted offer for 30 days from the submission date.
  • A preliminary guarantee of USD 1,000, deducted at the finance office of the supervision branch.
  • A document stating financial solvency, meaning the contractor's ability to self-finance if payments are delayed.
  • A final guarantee of 5% of the project's initial value payable by the approved contractor.
  • A delay penalty of 0.015 of the project value for each day of delay, with the project open to withdrawal if the delay exceeds 30 days.
  • Payment against periodic statements certified by the engineering supervision body, with the Directorate entitled to withhold 15% of each statement until final handover.

Preliminary guarantees are returned to unsuccessful bidders and are forfeited in full to the Directorate if the awarded bidder does not honour its offer.

Bid Opening and General Provisions

A bid-opening committee is formed by decision of the execution branch, and the session is held in closed format. Any offer that fails the technical conditions or the minimum technical score is excluded. An official record of the results is drawn up within one week of the end of the submission period.

The Directorate may contract for all or part of the work and may re-advertise if a suitable price is not reached. The notice and the resulting contracting procedures are governed by the laws in force at the Ministry of Defence and by the financial and administrative regulations of the Military Construction Directorate.

How to Apply

Add Your Tender !
Interested?