Syrian Petroleum Company

Tabiyeh Field Gas Processing Unit, Deir ez-Zor

Early gas output from two of five wells
Deir ez-Zor
Architecture :
Civil Engineering :
Developer :
No items found.
Area:
m²
Announcement :
01.09.2026
Update :
01.09.2026
tabiyeh-field-gas-processing-unit-deir-ez-zor-703659
40.319670031571086
35.34388396479633

An early gas production and processing unit at the Tabiyeh (Conoco) field, about 20 km northeast of Deir ez-Zor city, north of the Euphrates. Syrian Petroleum Company rehabilitated and restarted the unit with its own staff and local contractors; the Ministry of Energy announced its start-up on 1 September 2026.

Scope of Works

  • Restarting the gas production and processing station using equipment from the Tabiyeh plant, to separate water and condensates and dry the gas before it is pumped to facilities in the central region in Homs for further processing.
  • Rehabilitating the gas transmission line from the Tabiyeh plant toward Palmyra, including completing a missing section of about 5 km with an 18-inch diameter.
  • Repairing the line's sectional valves.

Production

The unit has started producing from two of five wells, while repairs continue on the remaining three. The Ministry of Energy estimates that, once rehabilitation is complete, the system will supply the gas network with 1 to 1.5 million cubic metres per day.

Entities

  • Implementing and operating entity: Syrian Petroleum Company.
  • Supervising authority: Ministry of Energy.

Current Stage

The early unit is in service; work continues on repairing the remaining wells and completing an integrated production system at the field.

Share this post
Related Org. / Co.
Add Your Project!
Interested?
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.