Deir ez-Zor Specialized Oncology Hospital

Referral centre for three governorates
Deir ez-Zor
Architecture :
Civil Engineering :
Developer :
No items found.
Area:
m²
Announcement :
10.08.2026
Update :
10.08.2026
deir-ez-zor-oncology-hospital

About the project

A project to build a specialised oncology hospital in Deir ez-Zor city, whose foundation stone was laid on 10 August 2026. It aims to expand cancer care in the governorate and reduce patient referrals outside it, and is planned as a referral centre serving Deir ez-Zor, Raqqa and Hasakah.

Planned components

  • About 230 beds and 6 operating rooms dedicated to oncological surgery.
  • Specialist clinics, an emergency department and an intensive care unit.
  • Departments for chemotherapy, day care, haematology and oncology, and isolation.
  • A bone marrow transplant unit, plus radiotherapy, medical imaging and palliative care services.

Cost and timeline

The announced cost is about USD 21 million. The study phase is expected to take about 4 months, followed by about 30 months of construction, and the Ministry of Health expects the project to be completed and equipped within three years. USD 500,000 of a businessman's donation was allocated to medical equipment for the oncology centre.

Stakeholders

The Syrian Ministry of Health announced the project and laid the foundation stone in Deir ez-Zor, as part of a group of health projects announced in the governorate.

Current stage

The project is in its study phase after the foundation stone ceremony, to be followed by construction.

Share this post
Related Org. / Co.
Add Your Project!
Interested?
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Selected Projects .... Selected Projects .... Selected Projects ....
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.