

A project to build and equip a superior-grade (four-star) hotel in Maaloula, Rif Dimashq, with 75 rooms plus a range of suites and a total seating capacity of 750. The hotel includes a multipurpose hall seating 200, a four-star summer restaurant with a terrace commanding a distinctive view and seating 200, a summer pool with its supporting facilities, a gym, gardens and green areas, and a car park with its complementary uses. The works follow the demolition and removal of the existing old building.
What this means for a rebuilding company: the job opens with controlled demolition of the standing block, debris removal and site clearance, then excavation, foundations and the structural frame of a complete hotel. Fit-out follows across 75 rooms and suites, with a commercial kitchen and dining facilities, and a multipurpose hall needing acoustic treatment and AV systems. Specialist packages include a pool with filtration and water treatment, a gym, HVAC, lifts, fire detection and suppression, and extra-low-voltage systems. Extensive external works round it out: landscaping and green areas, a view terrace, parking, access roads and utility networks.
Source: Syrian Investment Agency — data as published in the official listing, accessed 2026-08-21.