

An existing sports facility in Al-Hamra, Homs, with a total area of 7,000 m² according to the plan attached to the terms and conditions booklet. It comprises the municipal swimming pool block, the wedding hall attached to it, and the tennis courts of Khalid Bin Al-Walid Sports City — three distinct operating components inside one compound.
What this means for a rebuilding company: this is a standing facility rather than raw land, so the route starts with a technical survey of all three components before any pricing — the condition of the structure and concrete shell, the pool's water treatment, filtration and heating plant, the sanitary and electrical installations, and the court surfaces and their equipment. The likely scope is rehabilitation and technical fit-out as defined by the terms and conditions booklet, not construction from scratch, and that scope is measured per square metre of finishing and replacement. Because the three components differ in nature, phased handover is possible: bringing the hall or the courts into operation before the longer pool works are complete.
Source: Investment in Homs — ihoms.org — data as published in the official listing, accessed 2026-08-21.