Al-Maloua Water Station in Tartus Gets 112 Solar Panels

19.11.2026

Rehabilitation works at the drinking water pumping station in Al-Maloua village, in the Al-Khawabi area of Tartus, have been completed. The project was funded by the Aga Khan Foundation in cooperation with the General Establishment for Drinking Water and Sanitation. The station serves about 950 residents in Al-Maloua and Dahr Al-Maloua.

Rehabilitation Works

Eng. Abdullah Al-Hammoud, director of the establishment in Tartus, told SANA the works covered:

  • Maintenance of the station building, including painting of walls, doors and panels.
  • Replacement of damaged window glass.
  • Renewal of the metal mesh on sewage grilles.
  • New concrete bases to secure the pumps.

Technical Equipment

Al-Hammoud said the technical works included installing a new vertical pumping unit with a lift height of up to 185 metres and a flow of 18 cubic metres per hour with all accessories, renewing the suction and pumping lines inside the station, and installing a chlorination unit for water disinfection.

The station also has a solar system of 112 panels that powers the chlorinator and station lighting, and runs the pumps and submersible units during daylight hours. He said this reduces reliance on the electricity grid and helps pumping continue during rationing and outages.

Pumping Volumes and Monitoring

The station draws on an artesian well yielding between 15 cubic metres per hour in winter and about 8 in summer, and currently pumps about 120 cubic metres daily. Al-Hammoud said this meets residents' current actual needs.

He added that the water is monitored daily and disinfected automatically with liquid chlorine, with periodic samples analysed in specialised laboratories to verify conformity with standard specifications and suitability for drinking.

New Well for Expansion

Al-Hammoud noted a new artesian well drilled near the station with a yield of about 22 cubic metres per hour. Work is under way to put it into service and connect it to the station, with the aim of supplying the villages of Al-Naama and Al-Olaya and separating them from the Jourat Al-Hisan project.

Share this post
Published on
19.11.2026
Keywords
water station, Al-Maloua, Tartus, solar energy, Aga Khan Foundation, drinking water, Al-Khawabi

Read More !

News
Saudi Fund Finances Syria's Power, Water and Housing Projects
Saudi Fund Finances Syria's Power, Water and Housing Projects
Read More
Read More
Blogs
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
How to Apply for a Tender in Syria: Procedure, Documents and Issuing Bodies
Read More
Read More
Square geometric Arabic calligraphy design with interlocking shapes in gray and white.
Updates